Brieghton Airfield

Excavated a large section of the old concrete runway, laid terram and levelled 1800 ton of 6f2 and type 1.

Laid 30,  3 metre x 1 metre preformed concrete drainage channels.

**EMERGENCIES**
24 hour service available, including utility’s, civil’s and Council. Tel: 07711 039034
Proud to work with
Accreditations
Tobermore Approved Paving Contractor
Social Links
Services
  • Footings
  • Driveways
  • Fencing
  • Ducting
  • Utility Work
  • Septic Tanks
  • Drainage
  • Roads/Paths
  • Drop Kerbs
  • Landscaping
  • Earthworks
  • Street Works
  • High Risk Excavation